To amend the Federal Power Act to require the Federal Energy Regulatory Commission to issue a final rule relating to the interconnection of large load facilities with the transmission system, and for other purposes.
Latest Action
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Sponsors
Actions
2026-09-24T00:00:00
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
2026-09-24T00:00:00
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
2026-09-24T00:00:00
Introduced in House
2026-09-24T00:00:00
Introduced in House
![Rep. Min, Dave [D-CA-47]](https://bioguide.congress.gov/bioguide/photo/M/M001241.jpg)